close search
Shaped Charges
Ion RP
Ion TS
Ion PSA
Ion SP
Liner Deployed M-Tool
Tubing Deployed M-Tool
Liner Deployed Steam Splitter
Steam Splitter
Pre-Fracturing Saltel Patch
Pangea Premium Mesh Screen
Pangea DWW
Pangea PPS
Hyperharrier Shifting Tool
Aero Harrier Shifting Tool
Precision Tracer
Precision Micro
Precision Recloseable CT Fracturing Sleeve
Kickstart
Ultraflow
Oneshot Liner Hanger
Eco-X
Eagle
Fortress Setting Tool
Copperhead & Copperhead Extreme
ReacXion Slim-X Dissolvable Frac Plug
Reacxion Apex Dissolvable Frac Plug
FracXion Micro Composite Frac Plug
Extreme Temperature Saltel Patch
Extra Range Thermal Bridge Plug
Slim Drill Through Bridge Plug
MH Thermal Retrievable Bridge Plug
Thermal Permanent Bridge Plug
Cup Type Test Tool
Long Reach Setting Tool
TBL HSPR Setting Tool
MH Most Setting Tool
MH Liner Hanger Packer
High Strength Long Reach Liner Packer
Long Reach Liner Packer
TBL Thermal Liner Packer

no products found.

Usually placed at the toe of the well, the KickStart Lite is activated when hydraulic pressure is applied to the casing string. Once opened, a flow path is initiated to the reservoir facilitating pump down operations or even the placement of an initial stimulation treatment.
Toe Valve

Toe Initiation Port

Designed to provide an economic means to initiate communication with the reservoir.
Rated up to 18,000 psi [124 MPa]
Rated up to 285 degF [141 degC]
Easy access to the reservoir

Product Info

Product Info

Applications

  • Horizontal, deviated and vertical wells
  • Cemented well bores

Features & Benefits

  • Cost effective reservoir access
  • Eliminates initial coil tubing trip
  • Use with standard cementing procedures
  • Large flow ports allow for high stimulation rate
  • Sleeve shifts up to open and locks in position, eliminating risk of premature opening